Getting Started
This guide will walk you through your first render job with Fabrika Queue.
1. Add a Project
- Click the Add Job or the + button or drag and drop a Blender file (
.blend) into the Jobs List.
- The file will appear in the Jobs List on the left.
2. Configure a Task
- Expand the job you just added.
- You can create new tasks using the + Add Task button or Duplicate (⋮ menu or Shift+D) an existing one.
- Click to select the task and edit its properties in the Right panel. Look for the Render Settings and the Scene Settings sections.
- Tip (Override Presets): You can save your configured settings as a preset by clicking the presets icon (sliders) next to "Task Properties". This allows you to quickly apply the same render and scene settings to other tasks.
3. Start Rendering
- Use the Start Queue button in Queue Actions on the top right. This will process all queued tasks.
- The status indicator will turn Green (Rendering).
- You can switch to the Logs tab to see real-time output from Blender.
4. View Results
Once the render is complete:
- The task status will turn Completed.
- Go to the Output tab to see a preview of the rendered image/video.
- Click Open Folder to view the files in your file explorer.