Skip to main content

Getting Started

This guide will walk you through your first render job with Fabrika Queue.

1. Add a Project

  1. Click the Add Job or the + button or drag and drop a Blender file (.blend) into the Jobs List.
Adding a job to the queue
  1. The file will appear in the Jobs List on the left.
Job added to the queue

2. Configure a Task

  1. Expand the job you just added.
  2. You can create new tasks using the + Add Task button or Duplicate (⋮ menu or Shift+D) an existing one.
  3. Click to select the task and edit its properties in the Right panel. Look for the Render Settings and the Scene Settings sections.
    • Tip (Override Presets): You can save your configured settings as a preset by clicking the presets icon (sliders) next to "Task Properties". This allows you to quickly apply the same render and scene settings to other tasks.
Task properties

3. Start Rendering

  1. Use the Start Queue button in Queue Actions on the top right. This will process all queued tasks.
  2. The status indicator will turn Green (Rendering).
Starting a render job
  1. You can switch to the Logs tab to see real-time output from Blender.

4. View Results

Once the render is complete:

  1. The task status will turn Completed.
Render output
  1. Go to the Output tab to see a preview of the rendered image/video.
  2. Click Open Folder to view the files in your file explorer.